Electors with a physical illness or physical disability, whose name is not on the postal or special voters list, and who may have difficulty gaining access to their local polling station, may apply to have their vote transferred to a more accessible polling station in their constituency.
Glas Civil Engineering Ltd started construction work on the Slipways on the 12th August 2019. The in-river works at Kilcaran Slipway, Ardmulchan Slipway and Trim Castle Slipway are complete with landscaping works to be carried out and completed by the end of September. In the case of an Emergency these...
The cost of energy is at its highest in history. The global climate crisis along with the rise in energy costs seen in 2022 has highlighted the need for organisations to become more energy efficient.